About 603 results
Open links in new tab
  1. Ministry of Natural Resources and Forestry | Norfolk County

    Jul 22, 2025 · With additional funding provided by the Province in late 2024, Norfolk installed monitoring wells and conducted a more in-depth hydrogeological study. The final report, …

  2. To support the development proposal, I have provided a hydrogeological assessment report that indicates lots will utilize an individual subsurface sewage disposal system equipped with a …

  3. Ministry of Environment, Conservation and Parks - Norfolk County

    Jul 22, 2025 · With additional funding provided by the Province in late 2024, Norfolk installed monitoring wells and conducted a more in-depth hydrogeological study. The final report, …

  4. a hydrogeological study shall be conducted for aggregate operations that intend to use groundwater resources to wash their aggregate and will use greater than 50,000 litres per day …

  5. A WHPA illustrates four time-related capture zones that were determined through a hydrogeological investigation completed by Waterloo Hydrogeologic, May 2003 . These …

  6. 6.27 Wellhead Protection 6.27.1 Identification of Wellhead Protection Areas (WHPA) a) WHPAs shown as "Sensitivity Areas" on Schedule "A-6a" represent the WHPAs for the municipal wells …

  7. The holding provision (H) has been placed on the subject lands to ensure that the required hydrogeological study, stormwater management studies and any other agency requirements …

  8. The application, however, is not supported by a Hydrogeological or Geotechnical Report to confirm the land’s ability to support infiltration as a means of controlling runoff from the land.

  9. A WHPA illustrates four time-related capture zones that were determined through a hydrogeological investigation completed by Waterloo Hydrogeologic, May 2003 . These …

  10. In addition, a holding provision has been suggested on the lands to enable a necessary hydrogeological study to be done. Ben and Kathy Wall File No. Z-NO-17/90 P.o. Report No. …